# SD088 complete fictional AI Slack daily digest packet

Teaching data only. Alder Finch Works, every person, channel, message and `.invalid` destination is fictional. No Slack token, production API call, customer data, outbound link request or published post exists. Final state: `NOT_POSTED`.

## 1. Frozen run contract

| Field | Value |
|---|---|
| Run | SD088 / snapshot `sha256:sd088-teaching-v1` |
| Workspace | `T-SD088`; synthetic single workspace |
| Window | `[2026-10-06T00:00:00Z, 2026-10-07T00:00:00Z)` |
| Sources | `C-OPS`, `C-SVC`, `C-LCH`, `C-PRV` |
| Destination | proposed `#daily-operations`; broad internal audience |
| Retrieval | read-only teaching ledger; no real Slack calls |
| Posting | disabled; write scopes 0; post calls 0 |

## 2. Retrieval ledger

| Conversation | History pages | History records | Reply calls | Reply records | Terminal evidence | Exceptions |
|---|---:|---:|---:|---:|---|---|
| C-OPS / #field-operations | 3 | 68 | 24 | 24 | empty cursor recorded | none |
| C-SVC / #service-desk | 3 | 54 | 19 | 19 | empty cursor recorded | one synthetic retry, deduplicated |
| C-LCH / #release-coordination | 2 | 46 | 17 | 17 | empty cursor recorded | none |
| C-PRV / #project-raven-private | 2 | 32 | 12 | 12 | empty cursor recorded | destination cannot open one permalink |
| **Total** | **10** | **200** | **72** | **72** | **4 terminal cursors** | **one access blocker** |

History records include roots and reply-bearing records in the frozen teaching manifest; reply calls reconstruct 72 reply bodies and are not added again to the 200-record denominator. Page sizes are case fixtures, not Slack API recommendations.

## 3. Complete 200-record message manifest

| ID | Channel | UTC time | Role / parent | Author | State flags | Audience | Compact evidence excerpt |
|---|---|---|---|---|---|---|---|
| C001 | C-OPS | 2026-10-06T00:09:01Z | root | human | original; none | internal | dispatch board — North route jobs moved to the revised board; context opened |
| C002 | C-OPS | 2026-10-06T00:15:02Z | reply / C001 | human | original; none | internal | dispatch board — North route jobs moved to the revised board; constraint stated |
| C003 | C-OPS | 2026-10-06T00:21:03Z | reply / C001 | human | original; none | internal | dispatch board — North route jobs moved to the revised board; proposal recorded |
| C004 | C-OPS | 2026-10-06T00:27:04Z | root | human | original; none | internal | dispatch board — North route jobs moved to the revised board; evidence linked |
| C005 | C-OPS | 2026-10-06T00:33:05Z | reply / C004 | human | original; none | internal | dispatch board — North route jobs moved to the revised board; owner discussed |
| C006 | C-OPS | 2026-10-06T00:39:06Z | reply / C004 | human | original; none | internal | dispatch board — North route jobs moved to the revised board; deadline discussed |
| C007 | C-OPS | 2026-10-06T00:45:07Z | root | human | original; reaction present | internal | dispatch board — North route jobs moved to the revised board; risk challenged |
| C008 | C-OPS | 2026-10-06T00:51:08Z | reply / C007 | human | original; none | internal | dispatch board — North route jobs moved to the revised board; status corrected |
| C009 | C-OPS | 2026-10-06T00:57:09Z | reply / C007 | human | original; none | internal | dispatch board — North route jobs moved to the revised board; next step requested |
| C010 | C-OPS | 2026-10-06T01:03:10Z | root | human | original; none | internal | dispatch board — North route jobs moved to the revised board; thread checkpoint |
| C011 | C-OPS | 2026-10-06T01:09:11Z | reply / C010 | human | original; none | internal | pump inspection — Unit P-17 needs a second inspection; context opened |
| C012 | C-OPS | 2026-10-06T01:15:12Z | reply / C010 | human | original; none | internal | pump inspection — Unit P-17 needs a second inspection; constraint stated |
| C013 | C-OPS | 2026-10-06T01:21:13Z | root | human | edited; none | internal | pump inspection — Unit P-17 needs a second inspection; proposal recorded |
| C014 | C-OPS | 2026-10-06T01:27:14Z | reply / C013 | human | original; reaction present | internal | pump inspection — Unit P-17 needs a second inspection; evidence linked |
| C015 | C-OPS | 2026-10-06T01:33:15Z | reply / C013 | bot/app | original; none | internal | pump inspection — Unit P-17 needs a second inspection; owner discussed |
| C016 | C-OPS | 2026-10-06T01:39:16Z | root | human | original; none | internal | pump inspection — Unit P-17 needs a second inspection; deadline discussed |
| C017 | C-OPS | 2026-10-06T01:45:17Z | reply / C016 | human | original; none | internal | pump inspection — Unit P-17 needs a second inspection; risk challenged |
| C018 | C-OPS | 2026-10-06T01:51:18Z | reply / C016 | human | original; none | internal | pump inspection — Unit P-17 needs a second inspection; status corrected |
| C019 | C-OPS | 2026-10-06T01:57:19Z | root | human | original; none | internal | pump inspection — Unit P-17 needs a second inspection; next step requested |
| C020 | C-OPS | 2026-10-06T02:03:20Z | root | bot/app | original; none | internal | pump inspection — Unit P-17 needs a second inspection; thread checkpoint |
| C021 | C-OPS | 2026-10-06T02:09:21Z | reply / C020 | human | original; reaction present | internal | client arrival — Visitor arrival shifted to the west gate; context opened |
| C022 | C-OPS | 2026-10-06T02:15:22Z | root | human | original; none | internal | client arrival — Visitor arrival shifted to the west gate; constraint stated |
| C023 | C-OPS | 2026-10-06T02:21:23Z | root | human | original; none | internal | client arrival — Visitor arrival shifted to the west gate; proposal recorded |
| C024 | C-OPS | 2026-10-06T02:27:24Z | reply / C023 | human | original; none | internal | client arrival — Visitor arrival shifted to the west gate; evidence linked |
| C025 | C-OPS | 2026-10-06T02:33:25Z | root | bot/app | original; none | internal | client arrival — Visitor arrival shifted to the west gate; owner discussed |
| C026 | C-OPS | 2026-10-06T02:39:26Z | root | human | edited; none | internal | client arrival — Visitor arrival shifted to the west gate; deadline discussed |
| C027 | C-OPS | 2026-10-06T02:45:27Z | reply / C026 | human | original; none | internal | client arrival — Visitor arrival shifted to the west gate; risk challenged |
| C028 | C-OPS | 2026-10-06T02:51:28Z | root | human | original; reaction present | internal | client arrival — Visitor arrival shifted to the west gate; status corrected |
| C029 | C-OPS | 2026-10-06T02:57:29Z | root | human | original; none | internal | client arrival — Visitor arrival shifted to the west gate; next step requested |
| C030 | C-OPS | 2026-10-06T03:03:30Z | reply / C029 | bot/app | original; none | internal | client arrival — Visitor arrival shifted to the west gate; thread checkpoint |
| C031 | C-OPS | 2026-10-06T03:09:31Z | root | human | original; none | internal | parts shortage — Seal kit stock blocks two repairs; context opened |
| C032 | C-OPS | 2026-10-06T03:15:32Z | root | human | original; none | internal | parts shortage — Seal kit stock blocks two repairs; constraint stated |
| C033 | C-OPS | 2026-10-06T03:21:33Z | reply / C032 | human | original; none | internal | parts shortage — Seal kit stock blocks two repairs; proposal recorded |
| C034 | C-OPS | 2026-10-06T03:27:34Z | root | human | original; none | internal | parts shortage — Seal kit stock blocks two repairs; evidence linked |
| C035 | C-OPS | 2026-10-06T03:33:35Z | root | bot/app | original; reaction present | internal | parts shortage — Seal kit stock blocks two repairs; owner discussed |
| C036 | C-OPS | 2026-10-06T03:39:36Z | reply / C035 | human | original; none | internal | parts shortage — Seal kit stock blocks two repairs; deadline discussed |
| C037 | C-OPS | 2026-10-06T03:45:37Z | root | human | original; none | internal | parts shortage — Seal kit stock blocks two repairs; risk challenged |
| C038 | C-OPS | 2026-10-06T03:51:38Z | root | human | original; none | internal | parts shortage — Seal kit stock blocks two repairs; status corrected |
| C039 | C-OPS | 2026-10-06T03:57:39Z | reply / C038 | human | edited; none | internal | parts shortage — Seal kit stock blocks two repairs; next step requested |
| C040 | C-OPS | 2026-10-06T04:03:40Z | root | bot/app | original; none | internal | parts shortage — Seal kit stock blocks two repairs; thread checkpoint |
| C041 | C-OPS | 2026-10-06T04:09:41Z | root | human | original; none | internal | mobile sync — Offline forms need a sync retry; context opened |
| C042 | C-OPS | 2026-10-06T04:15:42Z | reply / C041 | human | original; reaction present | internal | mobile sync — Offline forms need a sync retry; constraint stated |
| C043 | C-OPS | 2026-10-06T04:21:43Z | root | human | original; none | internal | mobile sync — Offline forms need a sync retry; proposal recorded |
| C044 | C-OPS | 2026-10-06T04:27:44Z | root | human | original; none | internal | mobile sync — Offline forms need a sync retry; evidence linked |
| C045 | C-OPS | 2026-10-06T04:33:45Z | reply / C044 | bot/app | original; none | internal | mobile sync — Offline forms need a sync retry; owner discussed |
| C046 | C-OPS | 2026-10-06T04:39:46Z | root | human | original; none | internal | mobile sync — Offline forms need a sync retry; deadline discussed |
| C047 | C-OPS | 2026-10-06T04:45:47Z | root | human | deleted tombstone | internal | mobile sync — deleted tombstone |
| C048 | C-OPS | 2026-10-06T04:51:48Z | reply / C047 | human | original; none | internal | mobile sync — Offline forms need a sync retry; status corrected |
| C049 | C-OPS | 2026-10-06T04:57:49Z | root | human | original; reaction present | internal | mobile sync — Offline forms need a sync retry; next step requested |
| C050 | C-OPS | 2026-10-06T05:03:50Z | root | bot/app | original; none | internal | mobile sync — Offline forms need a sync retry; thread checkpoint |
| C051 | C-OPS | 2026-10-06T05:09:51Z | reply / C050 | human | original; none | internal | weekend roster — Saturday coverage still lacks one approver; context opened |
| C052 | C-OPS | 2026-10-06T05:15:52Z | root | human | edited; none | internal | weekend roster — Saturday coverage still lacks one approver; constraint stated |
| C053 | C-OPS | 2026-10-06T05:21:53Z | root | human | original; none | internal | weekend roster — Saturday coverage still lacks one approver; proposal recorded |
| C054 | C-OPS | 2026-10-06T05:27:54Z | reply / C053 | human | original; none | internal | weekend roster — Saturday coverage still lacks one approver; evidence linked |
| C055 | C-OPS | 2026-10-06T05:33:55Z | root | bot/app | original; none | internal | weekend roster — Saturday coverage still lacks one approver; owner discussed |
| C056 | C-OPS | 2026-10-06T05:39:56Z | root | human | original; reaction present | internal | weekend roster — Saturday coverage still lacks one approver; deadline discussed |
| C057 | C-OPS | 2026-10-06T05:45:57Z | reply / C056 | human | original; none | internal | weekend roster — Saturday coverage still lacks one approver; risk challenged |
| C058 | C-OPS | 2026-10-06T05:51:58Z | root | human | original; none | internal | weekend roster — Saturday coverage still lacks one approver; status corrected |
| C059 | C-OPS | 2026-10-06T05:57:59Z | root | human | original; none | internal | weekend roster — Saturday coverage still lacks one approver; next step requested |
| C060 | C-OPS | 2026-10-06T06:04:00Z | reply / C059 | bot/app | original; none | internal | weekend roster — Saturday coverage still lacks one approver; thread checkpoint |
| C061 | C-OPS | 2026-10-06T06:10:01Z | root | human | original; none | internal | service credit — Credit eligibility requires contract review; context opened |
| C062 | C-OPS | 2026-10-06T06:16:02Z | root | human | original; none | internal | service credit — Credit eligibility requires contract review; constraint stated |
| C063 | C-OPS | 2026-10-06T06:22:03Z | reply / C062 | human | original; reaction present | internal | service credit — Credit eligibility requires contract review; proposal recorded |
| C064 | C-OPS | 2026-10-06T06:28:04Z | root | human | original; none | internal | service credit — Credit eligibility requires contract review; evidence linked |
| C065 | C-OPS | 2026-10-06T06:34:05Z | root | bot/app | edited; none | internal | service credit — Credit eligibility requires contract review; owner discussed |
| C066 | C-OPS | 2026-10-06T06:40:06Z | reply / C065 | human | original; none | internal | service credit — Credit eligibility requires contract review; deadline discussed |
| C067 | C-OPS | 2026-10-06T06:46:07Z | root | human | original; none | internal | service credit — Credit eligibility requires contract review; risk challenged |
| C068 | C-OPS | 2026-10-06T06:52:08Z | root | human | original; none | internal | service credit — Credit eligibility requires contract review; status corrected |
| C069 | C-SVC | 2026-10-06T06:58:09Z | reply / C068 | human | original; none | internal | service credit — Credit eligibility requires contract review; next step requested |
| C070 | C-SVC | 2026-10-06T07:04:10Z | root | bot/app | original; reaction present | internal | service credit — Credit eligibility requires contract review; thread checkpoint |
| C071 | C-SVC | 2026-10-06T07:10:11Z | root | human | original; none | internal | release 8.4 — Release window moved after dependency review; context opened |
| C072 | C-SVC | 2026-10-06T07:16:12Z | reply / C071 | human | original; none | internal | release 8.4 — Release window moved after dependency review; constraint stated |
| C073 | C-SVC | 2026-10-06T07:22:13Z | root | human | original; none | internal | release 8.4 — Release window moved after dependency review; proposal recorded |
| C074 | C-SVC | 2026-10-06T07:28:14Z | root | human | original; none | internal | release 8.4 — Release window moved after dependency review; evidence linked |
| C075 | C-SVC | 2026-10-06T07:34:15Z | reply / C074 | bot/app | original; none | internal | release 8.4 — Release window moved after dependency review; owner discussed |
| C076 | C-SVC | 2026-10-06T07:40:16Z | root | human | original; none | internal | release 8.4 — Release window moved after dependency review; deadline discussed |
| C077 | C-SVC | 2026-10-06T07:46:17Z | root | human | original; reaction present | internal | release 8.4 — Release window moved after dependency review; risk challenged |
| C078 | C-SVC | 2026-10-06T07:52:18Z | reply / C077 | human | edited; none | internal | release 8.4 — Release window moved after dependency review; status corrected |
| C079 | C-SVC | 2026-10-06T07:58:19Z | root | human | original; none | internal | release 8.4 — Release window moved after dependency review; next step requested |
| C080 | C-SVC | 2026-10-06T08:04:20Z | root | bot/app | original; none | internal | release 8.4 — Release window moved after dependency review; thread checkpoint |
| C081 | C-SVC | 2026-10-06T08:10:21Z | reply / C080 | human | original; none | internal | Raven pricing — Project Raven pricing is restricted; context opened |
| C082 | C-SVC | 2026-10-06T08:16:22Z | root | human | original; none | internal | Raven pricing — Project Raven pricing is restricted; constraint stated |
| C083 | C-SVC | 2026-10-06T08:22:23Z | root | human | original; none | internal | Raven pricing — Project Raven pricing is restricted; proposal recorded |
| C084 | C-SVC | 2026-10-06T08:28:24Z | reply / C083 | human | original; reaction present | internal | Raven pricing — Project Raven pricing is restricted; evidence linked |
| C085 | C-SVC | 2026-10-06T08:34:25Z | root | bot/app | original; none | internal | Raven pricing — Project Raven pricing is restricted; owner discussed |
| C086 | C-SVC | 2026-10-06T08:40:26Z | root | human | original; none | internal | Raven pricing — Project Raven pricing is restricted; deadline discussed |
| C087 | C-SVC | 2026-10-06T08:46:27Z | reply / C086 | human | original; none | internal | Raven pricing — Project Raven pricing is restricted; risk challenged |
| C088 | C-SVC | 2026-10-06T08:52:28Z | root | human | original; none | internal | Raven pricing — Project Raven pricing is restricted; status corrected |
| C089 | C-SVC | 2026-10-06T08:58:29Z | root | human | original; none | internal | Raven pricing — Project Raven pricing is restricted; next step requested |
| C090 | C-SVC | 2026-10-06T09:04:30Z | reply / C089 | bot/app | original; none | internal | Raven pricing — Project Raven pricing is restricted; thread checkpoint |
| C091 | C-SVC | 2026-10-06T09:10:31Z | root | human | edited; reaction present | internal | safety briefing — Briefing attendance needs reconciliation; context opened |
| C092 | C-SVC | 2026-10-06T09:16:32Z | root | human | original; none | internal | safety briefing — Briefing attendance needs reconciliation; constraint stated |
| C093 | C-SVC | 2026-10-06T09:22:33Z | reply / C092 | human | original; none | internal | safety briefing — Briefing attendance needs reconciliation; proposal recorded |
| C094 | C-SVC | 2026-10-06T09:28:34Z | root | human | deleted tombstone | internal | safety briefing — deleted tombstone |
| C095 | C-SVC | 2026-10-06T09:34:35Z | root | bot/app | original; none | internal | safety briefing — Briefing attendance needs reconciliation; owner discussed |
| C096 | C-SVC | 2026-10-06T09:40:36Z | reply / C095 | human | original; none | internal | safety briefing — Briefing attendance needs reconciliation; deadline discussed |
| C097 | C-SVC | 2026-10-06T09:46:37Z | root | human | original; none | internal | safety briefing — Briefing attendance needs reconciliation; risk challenged |
| C098 | C-SVC | 2026-10-06T09:52:38Z | root | human | original; reaction present | internal | safety briefing — Briefing attendance needs reconciliation; status corrected |
| C099 | C-SVC | 2026-10-06T09:58:39Z | reply / C098 | human | original; none | internal | safety briefing — Briefing attendance needs reconciliation; next step requested |
| C100 | C-SVC | 2026-10-06T10:04:40Z | root | bot/app | original; none | internal | safety briefing — Briefing attendance needs reconciliation; thread checkpoint |
| C101 | C-SVC | 2026-10-06T10:10:41Z | root | human | original; none | internal | ticket migration — Legacy ticket links need remapping; context opened |
| C102 | C-SVC | 2026-10-06T10:16:42Z | reply / C101 | human | original; none | internal | ticket migration — Legacy ticket links need remapping; constraint stated |
| C103 | C-SVC | 2026-10-06T10:22:43Z | root | human | original; none | internal | ticket migration — Legacy ticket links need remapping; proposal recorded |
| C104 | C-SVC | 2026-10-06T10:28:44Z | root | human | edited; none | internal | ticket migration — Legacy ticket links need remapping; evidence linked |
| C105 | C-SVC | 2026-10-06T10:34:45Z | reply / C104 | bot/app | original; reaction present | internal | ticket migration — Legacy ticket links need remapping; owner discussed |
| C106 | C-SVC | 2026-10-06T10:40:46Z | root | human | original; none | internal | ticket migration — Legacy ticket links need remapping; deadline discussed |
| C107 | C-SVC | 2026-10-06T10:46:47Z | root | human | original; none | internal | ticket migration — Legacy ticket links need remapping; risk challenged |
| C108 | C-SVC | 2026-10-06T10:52:48Z | reply / C107 | human | original; none | internal | ticket migration — Legacy ticket links need remapping; status corrected |
| C109 | C-SVC | 2026-10-06T10:58:49Z | root | human | original; none | internal | ticket migration — Legacy ticket links need remapping; next step requested |
| C110 | C-SVC | 2026-10-06T11:04:50Z | root | bot/app | original; none | internal | ticket migration — Legacy ticket links need remapping; thread checkpoint |
| C111 | C-SVC | 2026-10-06T11:10:51Z | reply / C110 | human | original; none | internal | supplier ETA — Supplier ETA remains unconfirmed; context opened |
| C112 | C-SVC | 2026-10-06T11:16:52Z | root | human | original; reaction present | internal | supplier ETA — Supplier ETA remains unconfirmed; constraint stated |
| C113 | C-SVC | 2026-10-06T11:22:53Z | root | human | original; none | internal | supplier ETA — Supplier ETA remains unconfirmed; proposal recorded |
| C114 | C-SVC | 2026-10-06T11:28:54Z | reply / C113 | human | original; none | internal | supplier ETA — Supplier ETA remains unconfirmed; evidence linked |
| C115 | C-SVC | 2026-10-06T11:34:55Z | root | bot/app | original; none | internal | supplier ETA — Supplier ETA remains unconfirmed; owner discussed |
| C116 | C-SVC | 2026-10-06T11:40:56Z | root | human | original; none | internal | supplier ETA — Supplier ETA remains unconfirmed; deadline discussed |
| C117 | C-SVC | 2026-10-06T11:46:57Z | reply / C116 | human | edited; none | internal | supplier ETA — Supplier ETA remains unconfirmed; risk challenged |
| C118 | C-SVC | 2026-10-06T11:52:58Z | root | human | original; none | internal | supplier ETA — Supplier ETA remains unconfirmed; status corrected |
| C119 | C-SVC | 2026-10-06T11:58:59Z | root | human | original; reaction present | internal | supplier ETA — Supplier ETA remains unconfirmed; next step requested |
| C120 | C-SVC | 2026-10-06T12:05:00Z | reply / C119 | bot/app | original; none | internal | supplier ETA — Supplier ETA remains unconfirmed; thread checkpoint |
| C121 | C-SVC | 2026-10-06T12:11:01Z | root | human | original; none | internal | dashboard alert — Duplicate alert rule was disabled; context opened |
| C122 | C-SVC | 2026-10-06T12:17:02Z | root | human | original; none | internal | dashboard alert — Duplicate alert rule was disabled; constraint stated |
| C123 | C-LCH | 2026-10-06T12:23:03Z | reply / C122 | human | original; none | internal | dashboard alert — Duplicate alert rule was disabled; proposal recorded |
| C124 | C-LCH | 2026-10-06T12:29:04Z | root | human | original; none | internal | dashboard alert — Duplicate alert rule was disabled; evidence linked |
| C125 | C-LCH | 2026-10-06T12:35:05Z | root | bot/app | original; none | internal | dashboard alert — Duplicate alert rule was disabled; owner discussed |
| C126 | C-LCH | 2026-10-06T12:41:06Z | reply / C125 | human | original; reaction present | internal | dashboard alert — Duplicate alert rule was disabled; deadline discussed |
| C127 | C-LCH | 2026-10-06T12:47:07Z | root | human | original; none | internal | dashboard alert — Duplicate alert rule was disabled; risk challenged |
| C128 | C-LCH | 2026-10-06T12:53:08Z | root | human | original; none | internal | dashboard alert — Duplicate alert rule was disabled; status corrected |
| C129 | C-LCH | 2026-10-06T12:59:09Z | reply / C128 | human | original; none | internal | dashboard alert — Duplicate alert rule was disabled; next step requested |
| C130 | C-LCH | 2026-10-06T13:05:10Z | root | bot/app | edited; none | internal | dashboard alert — Duplicate alert rule was disabled; thread checkpoint |
| C131 | C-LCH | 2026-10-06T13:11:11Z | root | human | original; none | internal | training cohort — Cohort capacity increased after room change; context opened |
| C132 | C-LCH | 2026-10-06T13:17:12Z | reply / C131 | human | original; none | internal | training cohort — Cohort capacity increased after room change; constraint stated |
| C133 | C-LCH | 2026-10-06T13:23:13Z | root | human | original; reaction present | internal | training cohort — Cohort capacity increased after room change; proposal recorded |
| C134 | C-LCH | 2026-10-06T13:29:14Z | root | human | original; none | internal | training cohort — Cohort capacity increased after room change; evidence linked |
| C135 | C-LCH | 2026-10-06T13:35:15Z | reply / C134 | bot/app | original; none | internal | training cohort — Cohort capacity increased after room change; owner discussed |
| C136 | C-LCH | 2026-10-06T13:41:16Z | root | human | original; none | internal | training cohort — Cohort capacity increased after room change; deadline discussed |
| C137 | C-LCH | 2026-10-06T13:47:17Z | root | human | original; none | internal | training cohort — Cohort capacity increased after room change; risk challenged |
| C138 | C-LCH | 2026-10-06T13:53:18Z | reply / C137 | human | original; none | internal | training cohort — Cohort capacity increased after room change; status corrected |
| C139 | C-LCH | 2026-10-06T13:59:19Z | root | human | original; none | internal | training cohort — Cohort capacity increased after room change; next step requested |
| C140 | C-LCH | 2026-10-06T14:05:20Z | root | bot/app | original; reaction present | internal | training cohort — Cohort capacity increased after room change; thread checkpoint |
| C141 | C-LCH | 2026-10-06T14:11:21Z | reply / C140 | human | deleted tombstone | internal | incident IR-44 — deleted tombstone |
| C142 | C-LCH | 2026-10-06T14:17:22Z | root | human | original; none | internal | incident IR-44 — IR-44 mitigation is monitoring only; constraint stated |
| C143 | C-LCH | 2026-10-06T14:23:23Z | root | human | edited; none | internal | incident IR-44 — IR-44 mitigation is monitoring only; proposal recorded |
| C144 | C-LCH | 2026-10-06T14:29:24Z | reply / C143 | human | original; none | internal | incident IR-44 — IR-44 mitigation is monitoring only; evidence linked |
| C145 | C-LCH | 2026-10-06T14:35:25Z | root | bot/app | original; none | internal | incident IR-44 — IR-44 mitigation is monitoring only; owner discussed |
| C146 | C-LCH | 2026-10-06T14:41:26Z | root | human | original; none | internal | incident IR-44 — IR-44 mitigation is monitoring only; deadline discussed |
| C147 | C-LCH | 2026-10-06T14:47:27Z | reply / C146 | human | original; reaction present | internal | incident IR-44 — IR-44 mitigation is monitoring only; risk challenged |
| C148 | C-LCH | 2026-10-06T14:53:28Z | root | human | original; none | internal | incident IR-44 — IR-44 mitigation is monitoring only; status corrected |
| C149 | C-LCH | 2026-10-06T14:59:29Z | root | human | original; none | internal | incident IR-44 — IR-44 mitigation is monitoring only; next step requested |
| C150 | C-LCH | 2026-10-06T15:05:30Z | reply / C149 | bot/app | original; none | internal | incident IR-44 — IR-44 mitigation is monitoring only; thread checkpoint |
| C151 | C-LCH | 2026-10-06T15:11:31Z | root | human | original; none | internal | customer export — Export file needs privacy review; context opened |
| C152 | C-LCH | 2026-10-06T15:17:32Z | root | human | original; none | internal | customer export — Export file needs privacy review; constraint stated |
| C153 | C-LCH | 2026-10-06T15:23:33Z | reply / C152 | human | original; none | internal | customer export — Export file needs privacy review; proposal recorded |
| C154 | C-LCH | 2026-10-06T15:29:34Z | root | human | original; reaction present | internal | customer export — Export file needs privacy review; evidence linked |
| C155 | C-LCH | 2026-10-06T15:35:35Z | root | bot/app | original; none | internal | customer export — Export file needs privacy review; owner discussed |
| C156 | C-LCH | 2026-10-06T15:41:36Z | reply / C155 | human | edited; none | internal | customer export — Export file needs privacy review; deadline discussed |
| C157 | C-LCH | 2026-10-06T15:47:37Z | root | human | original; none | internal | customer export — Export file needs privacy review; risk challenged |
| C158 | C-LCH | 2026-10-06T15:53:38Z | root | human | original; none | internal | customer export — Export file needs privacy review; status corrected |
| C159 | C-LCH | 2026-10-06T15:59:39Z | reply / C158 | human | original; none | internal | customer export — Export file needs privacy review; next step requested |
| C160 | C-LCH | 2026-10-06T16:05:40Z | root | bot/app | original; none | internal | customer export — Export file needs privacy review; thread checkpoint |
| C161 | C-LCH | 2026-10-06T16:11:41Z | root | human | original; reaction present | internal | maintenance slot — Maintenance begins at 01:30 UTC; context opened |
| C162 | C-LCH | 2026-10-06T16:17:42Z | reply / C161 | human | original; none | internal | maintenance slot — Maintenance begins at 01:30 UTC; constraint stated |
| C163 | C-LCH | 2026-10-06T16:23:43Z | root | human | original; none | internal | maintenance slot — Maintenance begins at 01:30 UTC; proposal recorded |
| C164 | C-LCH | 2026-10-06T16:29:44Z | root | human | original; none | internal | maintenance slot — Maintenance begins at 01:30 UTC; evidence linked |
| C165 | C-LCH | 2026-10-06T16:35:45Z | reply / C164 | bot/app | original; none | internal | maintenance slot — Maintenance begins at 01:30 UTC; owner discussed |
| C166 | C-LCH | 2026-10-06T16:41:46Z | root | human | original; none | internal | maintenance slot — Maintenance begins at 01:30 UTC; deadline discussed |
| C167 | C-LCH | 2026-10-06T16:47:47Z | root | human | original; none | internal | maintenance slot — Maintenance begins at 01:30 UTC; risk challenged |
| C168 | C-LCH | 2026-10-06T16:53:48Z | reply / C167 | human | original; reaction present | internal | maintenance slot — Maintenance begins at 01:30 UTC; status corrected |
| C169 | C-PRV | 2026-10-06T16:59:49Z | root | human | original; none | restricted | maintenance slot — Maintenance begins at 01:30 UTC; next step requested |
| C170 | C-PRV | 2026-10-06T17:05:50Z | root | bot/app | original; none | restricted | maintenance slot — Maintenance begins at 01:30 UTC; thread checkpoint |
| C171 | C-PRV | 2026-10-06T17:11:51Z | reply / C170 | human | original; none | restricted | handover template — New handover fields are proposed; context opened |
| C172 | C-PRV | 2026-10-06T17:17:52Z | root | human | original; none | restricted | handover template — New handover fields are proposed; constraint stated |
| C173 | C-PRV | 2026-10-06T17:23:53Z | root | human | original; none | restricted | handover template — New handover fields are proposed; proposal recorded |
| C174 | C-PRV | 2026-10-06T17:29:54Z | reply / C173 | human | original; none | restricted | handover template — New handover fields are proposed; evidence linked |
| C175 | C-PRV | 2026-10-06T17:35:55Z | root | bot/app | original; reaction present | restricted | handover template — New handover fields are proposed; owner discussed |
| C176 | C-PRV | 2026-10-06T17:41:56Z | root | human | original; none | restricted | handover template — New handover fields are proposed; deadline discussed |
| C177 | C-PRV | 2026-10-06T17:47:57Z | reply / C176 | human | original; none | restricted | handover template — New handover fields are proposed; risk challenged |
| C178 | C-PRV | 2026-10-06T17:53:58Z | root | human | original; none | restricted | handover template — New handover fields are proposed; status corrected |
| C179 | C-PRV | 2026-10-06T17:59:59Z | root | human | original; none | restricted | handover template — New handover fields are proposed; next step requested |
| C180 | C-PRV | 2026-10-06T18:06:00Z | reply / C179 | bot/app | original; none | restricted | handover template — New handover fields are proposed; thread checkpoint |
| C181 | C-PRV | 2026-10-06T18:12:01Z | root | human | original; none | restricted | billing queue — Three invoices lack purchase orders; context opened |
| C182 | C-PRV | 2026-10-06T18:18:02Z | root | human | original; reaction present | restricted | billing queue — Three invoices lack purchase orders; constraint stated |
| C183 | C-PRV | 2026-10-06T18:24:03Z | reply / C182 | human | original; none | restricted | billing queue — Three invoices lack purchase orders; proposal recorded |
| C184 | C-PRV | 2026-10-06T18:30:04Z | root | human | original; none | restricted | billing queue — Three invoices lack purchase orders; evidence linked |
| C185 | C-PRV | 2026-10-06T18:36:05Z | root | bot/app | original; none | restricted | billing queue — Three invoices lack purchase orders; owner discussed |
| C186 | C-PRV | 2026-10-06T18:42:06Z | reply / C185 | human | original; none | restricted | billing queue — Three invoices lack purchase orders; deadline discussed |
| C187 | C-PRV | 2026-10-06T18:48:07Z | root | human | original; none | restricted | billing queue — Three invoices lack purchase orders; risk challenged |
| C188 | C-PRV | 2026-10-06T18:54:08Z | root | human | deleted tombstone | restricted | billing queue — deleted tombstone |
| C189 | C-PRV | 2026-10-06T19:00:09Z | reply / C188 | human | original; reaction present | restricted | billing queue — Three invoices lack purchase orders; next step requested |
| C190 | C-PRV | 2026-10-06T19:06:10Z | root | bot/app | original; none | restricted | billing queue — Three invoices lack purchase orders; thread checkpoint |
| C191 | C-PRV | 2026-10-06T19:12:11Z | root | human | original; none | restricted | regional launch — Japan launch language remains disputed; context opened |
| C192 | C-PRV | 2026-10-06T19:18:12Z | reply / C191 | human | original; none | restricted | regional launch — Japan launch language remains disputed; constraint stated |
| C193 | C-PRV | 2026-10-06T19:24:13Z | root | human | original; none | restricted | regional launch — Japan launch language remains disputed; proposal recorded |
| C194 | C-PRV | 2026-10-06T19:30:14Z | root | human | original; none | restricted | regional launch — Japan launch language remains disputed; evidence linked |
| C195 | C-PRV | 2026-10-06T19:36:15Z | reply / C194 | bot/app | original; none | restricted | regional launch — Japan launch language remains disputed; owner discussed |
| C196 | C-PRV | 2026-10-06T19:42:16Z | root | human | original; none | restricted | regional launch — Japan launch language remains disputed; deadline discussed |
| C197 | C-PRV | 2026-10-06T19:48:17Z | root | human | original; none | restricted | regional launch — Japan launch language remains disputed; risk challenged |
| C198 | C-PRV | 2026-10-06T19:54:18Z | reply / C197 | human | original; none | restricted | regional launch — Japan launch language remains disputed; status corrected |
| C199 | C-PRV | 2026-10-06T20:00:19Z | root | human | original; none | restricted | regional launch — Japan launch language remains disputed; next step requested |
| C200 | C-PRV | 2026-10-06T20:06:20Z | root | bot/app | original; none | restricted | regional launch — Japan launch language remains disputed; thread checkpoint |

## 4. Manifest reconciliation

- Channel counts: `68 + 54 + 46 + 32 = 200`.
- Role counts: 128 roots + 72 replies = 200.
- Overlapping states: 12 edited, 4 deleted tombstones, 38 bot/app-authored, 27 reaction-bearing. They are not additive categories.
- Unique IDs: C001–C200, no gaps or duplicates.
- Boundary fixtures outside the manifest: one record at exactly 2026-10-05T23:59:59Z excluded; one at exactly 2026-10-07T00:00:00Z excluded.

## 5. Human gold labels

| ID | Type | Evidence | Gold interpretation | Authority / audience note |
|---|---|---|---|---|
| D01 | Decision | C004 | dispatch board: North route jobs moved to the revised board | human review required for final meaning |
| D02 | Decision | C014 | pump inspection: Unit P-17 needs a second inspection | human review required for final meaning |
| D03 | Decision | C024 | client arrival: Visitor arrival shifted to the west gate | human review required for final meaning |
| D04 | Decision | C034 | parts shortage: Seal kit stock blocks two repairs | human review required for final meaning |
| D05 | Decision | C044 | mobile sync: Offline forms need a sync retry | human review required for final meaning |
| D06 | Decision | C054 | weekend roster: Saturday coverage still lacks one approver | human review required for final meaning |
| D07 | Decision | C064 | service credit: Credit eligibility requires contract review | human review required for final meaning |
| D08 | Decision | C074 | release 8.4: Release window moved after dependency review | human review required for final meaning |
| D09 | Decision | C084 | Raven pricing: Project Raven pricing is restricted | human review required for final meaning |
| D10 | Decision | C094 | safety briefing: Briefing attendance needs reconciliation | human review required for final meaning |
| D11 | Decision | C104 | ticket migration: Legacy ticket links need remapping | human review required for final meaning |
| D12 | Decision | C114 | supplier ETA: Supplier ETA remains unconfirmed | human review required for final meaning |
| D13 | Decision | C124 | dashboard alert: Duplicate alert rule was disabled | human review required for final meaning |
| D14 | Decision | C134 | training cohort: Cohort capacity increased after room change | human review required for final meaning |
| D15 | Decision | C144 | incident IR-44: IR-44 mitigation is monitoring only | human review required for final meaning |
| D16 | Decision | C154 | customer export: Export file needs privacy review | human review required for final meaning |
| A01 | Action | C006 | dispatch board: North route jobs moved to the revised board | human review required for final meaning |
| A02 | Action | C016 | pump inspection: Unit P-17 needs a second inspection | human review required for final meaning |
| A03 | Action | C026 | client arrival: Visitor arrival shifted to the west gate | human review required for final meaning |
| A04 | Action | C036 | parts shortage: Seal kit stock blocks two repairs | human review required for final meaning |
| A05 | Action | C046 | mobile sync: Offline forms need a sync retry | human review required for final meaning |
| A06 | Action | C056 | weekend roster: Saturday coverage still lacks one approver | human review required for final meaning |
| A07 | Action | C066 | service credit: Credit eligibility requires contract review | human review required for final meaning |
| A08 | Action | C076 | release 8.4: Release window moved after dependency review | human review required for final meaning |
| A09 | Action | C086 | Raven pricing: Project Raven pricing is restricted | human review required for final meaning |
| A10 | Action | C096 | safety briefing: Briefing attendance needs reconciliation | human review required for final meaning |
| A11 | Action | C106 | ticket migration: Legacy ticket links need remapping | human review required for final meaning |
| A12 | Action | C116 | supplier ETA: Supplier ETA remains unconfirmed | human review required for final meaning |
| A13 | Action | C126 | dashboard alert: Duplicate alert rule was disabled | human review required for final meaning |
| A14 | Action | C136 | training cohort: Cohort capacity increased after room change | human review required for final meaning |
| A15 | Action | C146 | incident IR-44: IR-44 mitigation is monitoring only | human review required for final meaning |
| A16 | Action | C156 | customer export: Export file needs privacy review | human review required for final meaning |
| A17 | Action | C166 | maintenance slot: Maintenance begins at 01:30 UTC | human review required for final meaning |
| A18 | Action | C176 | handover template: New handover fields are proposed | human review required for final meaning |
| A19 | Action | C186 | billing queue: Three invoices lack purchase orders | human review required for final meaning |
| A20 | Action | C196 | regional launch: Japan launch language remains disputed | human review required for final meaning |
| A21 | Action | C031 | parts shortage: Seal kit stock blocks two repairs | human review required for final meaning |
| A22 | Action | C071 | release 8.4: Release window moved after dependency review | human review required for final meaning |
| A23 | Action | C111 | supplier ETA: Supplier ETA remains unconfirmed | human review required for final meaning |
| A24 | Action | C151 | customer export: Export file needs privacy review | human review required for final meaning |
| B01 | Blocker | C008 | dispatch board: North route jobs moved to the revised board | human review required for final meaning |
| B02 | Blocker | C028 | client arrival: Visitor arrival shifted to the west gate | human review required for final meaning |
| B03 | Blocker | C048 | mobile sync: Offline forms need a sync retry | human review required for final meaning |
| B04 | Blocker | C068 | service credit: Credit eligibility requires contract review | human review required for final meaning |
| B05 | Blocker | C088 | Raven pricing: Project Raven pricing is restricted | human review required for final meaning |
| B06 | Blocker | C108 | ticket migration: Legacy ticket links need remapping | human review required for final meaning |
| B07 | Blocker | C128 | dashboard alert: Duplicate alert rule was disabled | human review required for final meaning |
| B08 | Blocker | C148 | incident IR-44: IR-44 mitigation is monitoring only | human review required for final meaning |
| B09 | Blocker | C168 | maintenance slot: Maintenance begins at 01:30 UTC | human review required for final meaning |
| Q01 | Open question | C009 | dispatch board: North route jobs moved to the revised board | human review required for final meaning |
| Q02 | Open question | C019 | pump inspection: Unit P-17 needs a second inspection | human review required for final meaning |
| Q03 | Open question | C039 | parts shortage: Seal kit stock blocks two repairs | human review required for final meaning |
| Q04 | Open question | C059 | weekend roster: Saturday coverage still lacks one approver | human review required for final meaning |
| Q05 | Open question | C079 | release 8.4: Release window moved after dependency review | human review required for final meaning |
| Q06 | Open question | C099 | safety briefing: Briefing attendance needs reconciliation | human review required for final meaning |
| Q07 | Open question | C119 | supplier ETA: Supplier ETA remains unconfirmed | human review required for final meaning |
| Q08 | Open question | C139 | training cohort: Cohort capacity increased after room change | human review required for final meaning |
| Q09 | Open question | C159 | customer export: Export file needs privacy review | human review required for final meaning |
| Q10 | Open question | C179 | handover template: New handover fields are proposed | human review required for final meaning |
| Q11 | Open question | C199 | regional launch: Japan launch language remains disputed | human review required for final meaning |
| X01 | Disagreement | C018 | pump inspection: Unit P-17 needs a second inspection | human review required for final meaning |
| X02 | Disagreement | C058 | weekend roster: Saturday coverage still lacks one approver | human review required for final meaning |
| X03 | Disagreement | C098 | safety briefing: Briefing attendance needs reconciliation | human review required for final meaning |
| X04 | Disagreement | C138 | training cohort: Cohort capacity increased after room change | human review required for final meaning |
| X05 | Disagreement | C178 | handover template: New handover fields are proposed | human review required for final meaning |
| R01 | Restricted fact | C145 | incident IR-44: IR-44 mitigation is monitoring only | restricted; broad digest must omit or route |
| R02 | Restricted fact | C155 | customer export: Export file needs privacy review | restricted; broad digest must omit or route |
| R03 | Restricted fact | C165 | maintenance slot: Maintenance begins at 01:30 UTC | restricted; broad digest must omit or route |
| R04 | Restricted fact | C175 | handover template: New handover fields are proposed | restricted; broad digest must omit or route |
| R05 | Restricted fact | C185 | billing queue: Three invoices lack purchase orders | restricted; broad digest must omit or route |
| R06 | Restricted fact | C195 | regional launch: Japan launch language remains disputed | restricted; broad digest must omit or route |

Label counts are 16 decisions, 24 actions, 9 blockers, 11 open questions, 5 disagreements and 6 restricted facts. Tables may overlap in meaning; their sum is not a unique-insight count.

## 6. Initial 24 atomic digest claims

| Claim | Evidence | Draft treatment | Support state | Defect / required action |
|---|---|---|---|---|
| CL01 | C004 | dispatch board — North route jobs moved to the revised board | SUPPORTED | none |
| CL02 | C014 | pump inspection — Unit P-17 needs a second inspection | SUPPORTED | none |
| CL03 | C024 | client arrival — Visitor arrival shifted to the west gate | SUPPORTED | none |
| CL04 | C034 | parts shortage — Seal kit stock blocks two repairs | NEEDS_REVIEW | thread reply reconstruction incomplete; hold |
| CL05 | C044 | mobile sync — Offline forms need a sync retry | SUPPORTED | none |
| CL06 | C054 | weekend roster — Saturday coverage still lacks one approver | SUPPORTED | none |
| CL07 | C064 | service credit — Credit eligibility requires contract review | REJECT | owner inferred from proximity; replace with OWNER_NOT_STATED |
| CL08 | C074 | release 8.4 — Release window moved after dependency review | SUPPORTED | none |
| CL09 | C084 | Raven pricing — Project Raven pricing is restricted | SUPPORTED | none |
| CL10 | C094 | safety briefing — Briefing attendance needs reconciliation | SUPPORTED | none |
| CL11 | C104 | ticket migration — Legacy ticket links need remapping | SUPPORTED | none |
| CL12 | C155 | customer export — Export file needs privacy review | OMIT | restricted project price crossed audience boundary; omit |
| CL13 | C124 | dashboard alert — Duplicate alert rule was disabled | SUPPORTED | none |
| CL14 | C134 | training cohort — Cohort capacity increased after room change | NEEDS_REVIEW | evidence permalink inaccessible to destination reader |
| CL15 | C144 | incident IR-44 — IR-44 mitigation is monitoring only | SUPPORTED | none |
| CL16 | C154 | customer export — Export file needs privacy review | SUPPORTED | none |
| CL17 | C178 | handover template — New handover fields are proposed | REJECT | disagreement rewritten as consensus; reject |
| CL18 | C174 | handover template — New handover fields are proposed | SUPPORTED | none |
| CL19 | C184 | billing queue — Three invoices lack purchase orders | SUPPORTED | none |
| CL20 | C194 | regional launch — Japan launch language remains disputed | NEEDS_REVIEW | edited state requires operational-owner review |
| CL21 | C031 | parts shortage — Seal kit stock blocks two repairs | SUPPORTED | none |
| CL22 | C071 | release 8.4 — Release window moved after dependency review | SUPPORTED | none |
| CL23 | C111 | supplier ETA — Supplier ETA remains unconfirmed | SUPPORTED | none |
| CL24 | C151 | customer export — Export file needs privacy review | SUPPORTED | none |

State reconciliation: 18 SUPPORTED + 3 NEEDS_REVIEW + 2 REJECT + 1 OMIT = 24. Separately, comparison with the full gold set shows one decision and two actions absent from the draft.

## 7. Calculations

- Decision recall: `15 / 16 × 100 = 93.75%`.
- Action recall: `22 / 24 × 100 = 91.67%`.
- Owner attribution precision: `21 supported / 22 asserted × 100 = 95.45%`, rounded to two decimals.
- Atomic-claim support rate: `18 / 24 × 100 = 75.00%`.
- Restricted-disclosure violation rate: `1 / 6 × 100 = 16.67%`, rounded to two decimals; required threshold is 0.
- Production API calls: 0; Slack write scopes: 0; `chat.postMessage` calls: 0; link unfurls: 0; published posts: 0.

## 8. Review findings and disposition

| Finding | Evidence | Owner | Required closure | State |
|---|---|---|---|---|
| F01 pagination terminal state | retrieval ledger | Slack integration owner | retain per-conversation terminal cursor | PASS in fixture |
| F02 reply reconstruction | CL04 | retrieval owner | reconcile missing reply path | BLOCKED |
| F03 inferred owner | CL07 | operations owner | use OWNER_NOT_STATED | BLOCKED |
| F04 restricted disclosure | CL12 / R labels | information owner | remove pricing; rerun audience review | BLOCKED |
| F05 inaccessible permalink | CL14 | workspace owner | restricted appendix or approved accessible evidence | BLOCKED |
| F06 false consensus | CL17 / disagreement label | operational owner | preserve both positions and decision path | BLOCKED |
| F07 edited evidence | CL20 | operational owner | confirm which revision controls | NEEDS_REVIEW |
| F08 current API behavior | official Slack docs | implementation owner | recheck scopes, method limits and Retry-After at run time | OPEN |
| F09 untrusted message content | security fixture | security owner | keep outbound network and posting disabled | PASS in fixture |
| F10 exact release version | no release hash | release owner | approve evidence, draft and destination together | BLOCKED |

Final disposition: `NOT_POSTED`. The packet is suitable for review and teaching only. It is not a customer result, legal opinion, security certification, permission to monitor employees, or authorization to post into Slack.
